hi,
I have the folowing design:
Two paper suppliers, slips of paper and measurement points on each slip. For each supplier we take, say, 3 slips of paper and on each slip we define 6 measurement points. Each slip is painted (same paint, same machine, same operator) and gloss is measured in...